Columbus Airport (CSG) Main Terminal Rehabilitation
Date: September 2020
Designed in the 1980s and having been in operation since 1991, the terminal rehabilitation project at Columbus Airport will reconfigure existing spaces and update building systems to ensure the airport can operate efficiently in today’s airport environment. The renovated terminal will include an updated Interior design with architectural enhancements, material upgrades, modern visual accents, and a new signage system for improved wayfinding.